Part of

New Museum of Contemporary Art – New York City, New York

leave a comment »

Building: New Museum of Contemporary Art
Location: New York, New York

Design/Construction Team and Product Info

City of New York

Client Representative:
Zubatkin Owner Representation, New York City
Marty Zubatkin, President
Andy Bast

Kazuyo Sejima + Ryue Nishizawa / SANAA
7-A, 2-2-35, Higashi-Shinagawa, Shinagawa-ku
Tokyo, 140-0002
Tel: +81.33450.1780

Associate Architect:
Gensler, New York City
Madeline Burke-Vigeland, Principal
William Rice, Project Manager
Karen Pedrazzi, Kazuyo Sejima + Ryue Nishizawa / SANAA
Kristian Gregerson
John Chow
Will Rohde
Sohee Moon
Christopher Duisberg
Edgar Papazian

Education Center Interiors 5th Floor:
Christoff: Finio Architecture
Martin Finio and Taryn Christoff, Principals




Executive Structural Engineer:
Simpson Gumperts & Heger Inc., New York City
James C. Parker, Principal
Kevin Poulin, Project Engineer
Fillipo Masetti

Structural Engineer:
Guy Nordenson and Associates, New York City
Guy Nordenson, Principal
Brett Schneider, Project Engineer
SAPS – Sasaki and Partners (competition)

Mechanical/Hvac Engineer:
Raymond Quinn, Principal
Camille Allocca


Fire Protection:
Victor Gomez

Electrical Systems:
Elizabeth Perez, Swan Foo

Code Consultant:
Jerome S. Gillman Consulting Architect, P.C.
Jerome Gillman,
Larry Gillman, Orlando Diaz, Jozef Vasko

Facade Consultants:
Simpson Gumperts & Heger Inc., New York City
James C. Parker, Principal
Sean O’Brien

Vertical Engineering:
Jenkins & Huntington, Inc.
Transportation Kevin Huntington, President
Tom Terhaar

Audio/ Visual And I.T. Consultant:
Peter Berry
Raj Patel, Chris Taylor, Adriana Sangeorzan

Security Consultant:
Ducibella Venter & Santore
Philip Santore, Principal
Brian Coulombe

Lighting Consultant:
Tillotson Design
Suzan Tillotson, Principal
David Buyra

Food Facilities Consultant:
Post & Grossbard
Henry Grossbard, Principal
Cody Hicks

Waterproofing/ Roofing Consultant:
Henshell & Buccellato
Justin Henshell
Paul Buccellato

Fire Alarm Consultant:
Acotech Services
Sid Aconsky

Geotechnical Engineer:
Langan Engineering & Environmental Services
Brian Ladd

Concrete Consultant:
Alan Bouknight

Cost Estimators:
Stuart-Lynn Company, Inc.
Breck Perkins, Principal


Project Management:
Plaza Construction Corporation, New York City
Richard Wood, President
Christopher Mills, John Nowak Sr.

Construction Management:
Sciame, New York City
Frank J. Sciame, Principal

Construction Team: Michael Porcelli, Mark Pankoff, Susan Ospina, Lou Silbert, Kyle Rolf, Anthony Turturro, Rich Bergen, Andrew Sciame, Charles Hsu, Ralph Thompson, Darrin McIntyre, Adam Giusti

Cord Contracting Company. Inc., NY

Structural steel stud framing: Marino Ware

Gypsum sheathing: DensGlass Gold, Georgia Pacific

Waterproofing: Henry Air-Block, Henry Company


Steel structure with concrete slab on composite steel deck. Concrete foundation walls and mat foundation.

Exterior Materials:
Expanded aluminum mesh (anodized) mounted with stainless steel clips on painted extruded aluminum liner panel, Structural stud exterior wall; Glass windows in painted aluminum frames;
Low iron glass storefront with anodized aluminum mullion system; Glass fritted skylights covered with aluminum grating

Interior Finishes:
Public Areas: Polished concrete floors, drywall, metal mesh ceilings

Galleries: Polished concrete floors, drywall, exposed ceilings

Offices: Carpeted floors, drywall, drywall Ceilings

Multi-purpose Room 7th floor: Poured epoxy floor, low iron glass storefront windows wrapping space to terrace, drywall, acoustical plaster Ceiling

Façade Cladding:
Contractor: McGrath Inc., Minneapolis, USA

Expanded aluminum mesh with anodized finish (custom):
Expanded Metal Company, UK

Stainless steel mesh clips (custom): James & Taylor, UK

Mesh and clip engineering / procurement: James & Taylor, UK

Extruded aluminum liner panel (custom): McGrath Inc.

Contractor: Competition Architectural Metals Inc., NY

Aluminum frame windows: Wausau Windows
Glass: Viracon

Contractor: Competition Architectural Metals Inc., NY

Curtain Wall:
Aluminum curtainwall mullion: US Aluminum

Glass: Starphire

Glass door pivot hardware: Rixson

Glass door handles: C.R. Laurence Co.

Loading dock doors (custom): Competition Architectural Metals Inc.

Interior Wall:
Contractor: Cord Contracting Company. Inc., NY

Gypsum board: USG

Stud framing: Marino Ware

Paint: Sherwin Williams

Contractor: Atlantech

Skylight system: Supersky

Glass: Solarban, PPG

Contractor: Dooley Electric, NY

Fluorescent lighting: Bartco Lighting

Gallery busway lighting: LSI

Downlights: Lucifer Lighting Company

Custom Millwork:
Miller Blaker Inc., NY
Lobby, Café
Museum Store


Epoxy Floor 7th Floor:
Tennant Flooring

Glass Tiles: Bathrooms

Acoustical Plaster Ceiling 7th Floor:
Star-Silent, Pyrok

Faucets: Vola

Toilets/urinals: Toto

Doors/Frames: Michbi Doors Inc., NY

Written by Gregory Brooks

February 6, 2012 at 11:55 pm

Posted in Uncategorized

Leave a Reply

Fill in your details below or click an icon to log in: Logo

You are commenting using your account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: